Ask the Expert

How to perform an inter-site replication between two domain controllers

I have two sites and plan to perform an inter-site replication between two domain controllers. Do I need to assign a single master operation on the additional domain controller for fault tolerance if one goes down or is only one Global Catalog required?

Requires Free Membership to View

You should configure a minimum of two domain controllers in each domain, and at least one per site. If you are in a single-domain environment, I recommend configuring all domain controllers as Global Catelogs, as this has no replication impact in a single-domain environment.

This was first published in September 2007

There are Comments. Add yours.

 
TIP: Want to include a code block in your comment? Use <pre> or <code> tags around the desired text. Ex: <code>insert code</code>

REGISTER or login:

Forgot Password?
By submitting you agree to receive email from TechTarget and its partners. If you reside outside of the United States, you consent to having your personal data transferred to and processed in the United States. Privacy
Sort by: OldestNewest

Forgot Password?

No problem! Submit your e-mail address below. We'll send you an email containing your password.

Your password has been sent to: